MUMBAI METRO

Mumbai Metro

Mumbai Metro lines: running, partly running, under construction and approved, with status, map and verified sources.

Network at a glance

4running
3partly running
6under construction
2approved

20 recorded lines across the Mumbai Metro, Navi Mumbai Metro and Mumbai Monorail, plus 4 planned and 1 suspended record — every line carries its source and its as-of date; sketch outlines are simplified and labelled, never presented as survey data.

Running — 4 lines

Partly running — 3 lines

Under construction — 6 lines

Approved — 2 lines

Planned — 4 lines

Suspended — 1 line

Airport connections → Two airports serve the region — CSMIA at Santacruz and Sahar, and Navi Mumbai International Airport; see the dedicated airports section for guides, phases and reach.

Network map

A schematic map in each line's published colour — open the full map. Simplified and not to scale. Solid = running, long dash = partly running, dashed = under construction, dotted = approved / planned, faded = suspended.

Mumbai Metro network sketch map with every recorded line in its published colour

Getting to Navi Mumbai Airport

  • Metro Line 8 — CSMIA T2 ↔ NMIA — Approved. Approved airport-to-airport metro corridor (about 20 stations, 35 km planned). Not under construction; no opening date announced.
  • Navi Mumbai Metro Line 1 — Partly running. Belapur–Pendhar section (11.1 km, 11 stations) in service since 17 November 2023. The airport is planned to be reached via the Khandeshwar extension and a Khandeshwar–NMIA link, where it would meet Line 8.
  • Navi Mumbai Metro Line 1A — Approved. 3 km extension (Sagar Sangam–Belapur CBD) approved by the Maharashtra government in 2026; planned to connect with the proposed Line 8 at Sagar Sangam.
  • Targhar railway station (suburban network) — Planned. The airport is planned to be connected to the Mumbai Suburban Railway at Targhar. It is also the proposed terminal of the Mumbai–Hyderabad high-speed rail corridor.
  • Atal Setu (Mumbai Trans Harbour Link) — Running. Main road link between Mumbai and Navi Mumbai; onward six-lane Ulwe coastal road to the airport is part of CIDCO's announced programme.
  • Ulwe and Kharghar coastal roads — Planned. CIDCO announced two six-lane coastal roads: the Ulwe coastal road linking Atal Setu to the airport, and the Kharghar coastal road improving access from Kharghar. Verify the current construction stage with CIDCO.
  • NH-348 and Aamra Marg — Running. NH-348 runs along the eastern boundary of the airport and Aamra Marg runs along the western boundary.

See the Navi Mumbai Airport guide for airport facts and phases.

Sourced timeline

  • 2014-02-02 — Opened: Mumbai Monorail Line 1 (Chembur ↔ Sant Gadge Maharaj Chowk)
  • 2014-06-08 — Opened: Mumbai Metro Line 1 (Versova ↔ Ghatkopar)
  • 2022-04-02 — Opened: Mumbai Metro Line 2A (Andheri West ↔ Dahisar East)
  • 2022-04-02 — Opened: Mumbai Metro Line 7 (Dahisar East ↔ Gundavali)
  • 2023-11-17 — Opened: Navi Mumbai Metro Line 1 (CBD Belapur ↔ Khandeshwar)
  • 2024-10-07 — Opened: Mumbai Metro Line 3 (Cuffe Parade ↔ Aarey JVLR)
  • 2026-04-08 — Opened: Mumbai Metro Line 2B (Maharashtranagar Mandale ↔ Andheri West)
  • 2026-04-08 — Opened: Mumbai Metro Line 9 (Dahisar East ↔ Subhash Chandra Bose Stadium)
  • 2026-11-01 — Target: Mumbai Metro Line 9 (Dahisar East ↔ Subhash Chandra Bose Stadium)
  • 2027-01-01 — Target: Mumbai Metro Line 7A (Gundavali ↔ CSMIA T2)
  • 2028-12-01 — Target: Mumbai Metro Line 2B (Maharashtranagar Mandale ↔ Andheri West)
  • 2028-12-01 — Target: Mumbai Metro Line 4 (Bhakti Park (Wadala) ↔ Kasarvadavali)
  • 2028-12-01 — Target: Mumbai Metro Line 4A (Kasarvadavali ↔ Gaimukh)
  • 2028-12-01 — Target: Mumbai Metro Line 5 (Kapurbawdi ↔ Kalyan APMC)
  • 2028-12-01 — Target: Mumbai Metro Line 6 (Swami Samarth Nagar (Lokhandwala) ↔ Vikhroli EEH)
  • 2032-12-01 — Target: Mumbai Metro Line 12 (Kalyan APMC ↔ Taloja)

A target is a published plan, not a confirmed opening; every entry keeps the source recorded on its line page.

Frequently asked questions

  • Which metro lines are running today? 4 lines are marked Running and 3 are Partly running as of 2026-10-18; each line page records its own sources.
  • What does "partly running" mean? Part of the corridor is in service while other sections are under construction or awaiting opening; each line page lists exactly which sections are open.
  • What does "target" mean? A target is a date published in the recorded sources — a plan, not a confirmed opening date.
  • Where do these facts come from? Every line, segment and station record carries a source and an as-of date; missing values are shown as not confirmed.

Sources for this page

Statuses recorded as of 2026-10-18; missing values are shown as not confirmed. Sketch geometry is simplified and not to scale.