Line 12 · Orange (Kalyan APMC ↔ Taloja): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Under construction |
|---|---|
| Operator | MMRDA / MMMOCL |
| Corridor being built | 20.75 km |
| Stations recorded | 17 recorded |
| Opened | Not recorded |
| Target | 2032-12-01 |
| Colour | #FF8200 |
| Status as of | 2026-10-18 |
Corridor: Kalyan APMC ↔ Taloja.
What is being built
20.75 km and 17 recorded stations are under construction, with a published target of 2032-12-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Under construction corridor across Kalyan-Dombivli towards Taloja; targeted December 2032.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 17 stations
- Kalyan APMC
- Ganesh Nagar (Kalyan)
- Pisavali Gaon
- Golavali
- Dombivali MIDC
- Sagaon
- Sonarpada
- Manpada (Dombivali East)
- Hedutane
- Kolegaon
- Nilaje Gaon
- Vadavali
- Bale
- Waklan
- Turbhe
- Pisarve
- Taloja
Timeline
- 2032-12-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.