Mumbai Metro
Line 11 · Green
Line 11 · Green (CSMT ↔ Bhakti Park (Wadala)): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Planned |
|---|---|
| Operator | Not confirmed |
| Planned corridor length | 18 km |
| Stations recorded | 11 recorded of 15 on the full line |
| Opened | Not recorded |
| Target | — |
| Colour | #00AE5A |
| Status as of | 2026-10-18 |
Corridor: CSMT ↔ Bhakti Park (Wadala).
Planned corridor
The corridor is recorded as planned. Not under construction — no section is recorded as under construction, and no opening date is recorded.
Proposed corridor connecting CSMT with Bhakti Park (Wadala) along the eastern waterfront; soil testing stage. Eleven alignment names are published so far.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Planned — 11 stations
- Chhatrapati Shivaji Maharaj Terminus ↔ Line 3
- Carnac Bunder
- Clock Tower
- Wadi Bunder
- Darukhana
- Coal Bunder
- Hay Bunder
- Sewri
- BPT Hospital
- Ganesh Nagar
- Bhakti Park (Wadala) ↔ Line 4 (under construction)
11 of 15 stations on this line have individual records so far.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.