Mumbai Metro

Line 2B · Yellow

Line 2B · Yellow (Maharashtranagar Mandale ↔ Andheri West): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusPartly running
OperatorMMMOCL (Maha Mumbai Metro Operation Corporation Ltd)
Length in service6.83 km
Stations in service6 in service · 20 planned on the full corridor
Opened2026-04-08
Target2028-12-01
Colour#FFC600
Status as of2026-10-18

Corridor: Maharashtranagar Mandale ↔ Andheri West.

Riding this line

This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:

Partly running: the Mandale–Chembur section (6 stations, 6.83 km) is in service (opened 8 April 2026, extended to Chembur on 13 August 2026). The remaining corridor towards Andheri West is under construction, targeted December 2028.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 2B

Opened & targeted sections

  • Diamond Garden → Maharashtranagar Mandale — Running · opened 2026-04-08 · 5.53 km · 5 stations
  • Chembur → Diamond Garden — Running · opened 2026-08-13 · 1.3 km · 1 stations
  • Andheri West → Saraswat Nagar — Under construction · target 2028-12-01 · 6 stations
  • Saraswat Nagar → Chembur — Under construction · target 2028-12-01 · 8 stations

Stations on this line

In service — 6 stations

  1. Maharashtranagar Mandale
  2. Mankhurd
  3. Deonar
  4. Chhatrapati Shivaji Maharaj Chowk (Chembur)
  5. Deshbhakt N.G. Acharya Udyan–Diamond Garden
  6. Chembur

Under construction — 14 stations

  1. Eastern Express Highway
  2. Kurla (East)
  3. SG Barve Marg
  4. MTNL
  5. ILFS
  6. Income Tax Office
  7. Bandra
  8. National College (Bandra)
  9. Saraswat Nagar
  10. Khira Nagar
  11. Nanavati Hospital
  12. Indira Nagar (Vile Parle)
  13. Prem Nagar
  14. ESIC Nagar

Timeline

  • 2026-04-08 — Opened: First section opened
  • 2026-08-13 — Opened: Chembur to Diamond Garden
  • 2028-12-01 — Target: Full line target

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.