मुंMumbai DarshanMMR Explorer

Mumbai Metro

Line 4 · Green

Line 4 · Green (Bhakti Park (Wadala) ↔ Kasarvadavali): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusUnder construction
OperatorMMRDA / MMMOCL
Corridor being built32.32 km
Stations recorded34 recorded
OpenedNot recorded
Target2028-12-01
Colour#00AE5A
Status as of2026-10-18

Corridor: Bhakti Park (Wadala) ↔ Kasarvadavali.

What is being built

32.32 km and 34 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.

Official updates:

Under construction along the Eastern Express Highway to Thane; targeted December 2028. The 2.88 km Kasarvadavali–Gaimukh continuation is Line 4A.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 4

Stations on this line

Under construction — 34 stations

  1. Bhakti Park (Wadala)
  2. Wadala Truck Terminal
  3. Anik Nagar Bus Depot
  4. Suman Nagar
  5. Siddharth Colony
  6. Amar Mahal Junction
  7. Garodia Nagar
  8. Pant Nagar
  9. Laxmi Nagar (Ghatkopar)
  10. Shreyas Cinema
  11. Godrej Company
  12. Vikhroli
  13. Surya Nagar
  14. Gandhi Nagar (Kanjurmarg) ↔ Kanjurmarg West (Line 6, under construction)
  15. Naval Housing
  16. Bhandup Mahapalika
  17. Bhandup
  18. Shangrila
  19. Sonapur
  20. Mulund Fire Station
  21. Mulund Naka
  22. Teen Haath Naka (Thane)
  23. RTO Thane
  24. Mahapalika Marg
  25. Cadbury Junction
  26. Majiwada
  27. Kapurbawdi ↔ Line 5
  28. Manpada (Thane)
  29. Tikuji-ni-wadi
  30. Dongripada
  31. Vijay Garden
  32. Kasarvadavali
  33. Gowniwada
  34. Gaimukh

Timeline

  • 2028-12-01 — Target: Full line target

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.