Mumbai Metro
Line 4 · Green
Line facts
| Status | Under construction |
|---|---|
| Operator | MMRDA / MMMOCL |
| Corridor being built | 32.32 km |
| Stations recorded | 34 recorded |
| Opened | Not recorded |
| Target | 2028-12-01 |
| Colour | #00AE5A |
| Status as of | 2026-10-18 |
Corridor: Bhakti Park (Wadala) ↔ Kasarvadavali.
What is being built
32.32 km and 34 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Under construction along the Eastern Express Highway to Thane; targeted December 2028. The 2.88 km Kasarvadavali–Gaimukh continuation is Line 4A.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 34 stations
- Bhakti Park (Wadala)
- Wadala Truck Terminal
- Anik Nagar Bus Depot
- Suman Nagar
- Siddharth Colony
- Amar Mahal Junction
- Garodia Nagar
- Pant Nagar
- Laxmi Nagar (Ghatkopar)
- Shreyas Cinema
- Godrej Company
- Vikhroli
- Surya Nagar
- Gandhi Nagar (Kanjurmarg) ↔ Kanjurmarg West (Line 6, under construction)
- Naval Housing
- Bhandup Mahapalika
- Bhandup
- Shangrila
- Sonapur
- Mulund Fire Station
- Mulund Naka
- Teen Haath Naka (Thane)
- RTO Thane
- Mahapalika Marg
- Cadbury Junction
- Majiwada
- Kapurbawdi ↔ Line 5
- Manpada (Thane)
- Tikuji-ni-wadi
- Dongripada
- Vijay Garden
- Kasarvadavali
- Gowniwada
- Gaimukh
Timeline
- 2028-12-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.