Mumbai Metro
Line 6 · Pink
Line 6 · Pink (Swami Samarth Nagar (Lokhandwala) ↔ Vikhroli EEH): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Under construction |
|---|---|
| Operator | MMRDA / MMMOCL |
| Corridor being built | 14.47 km |
| Stations recorded | 13 recorded |
| Opened | Not recorded |
| Target | 2028-12-01 |
| Colour | #F99FC9 |
| Status as of | 2026-10-18 |
Corridor: Swami Samarth Nagar (Lokhandwala) ↔ Vikhroli EEH.
What is being built
14.47 km and 13 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Under construction corridor linking Andheri West, Jogeshwari, Powai and Vikhroli; targeted December 2028.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 13 stations
- Swami Samarth Nagar (Lokhandwala)
- Adarsh Nagar (Mumbai) ↔ Lower Oshiwara (Line 2A)
- Jogeshwari (West)
- JVLR Junction ↔ Jogeshwari East (Line 7)
- Shyam Nagar (Mumbai)
- Mahakali Caves
- SEEPZ Village ↔ SEEPZ (Line 3)
- Saki Vihar Road
- Rambaug (Powai)
- Powai Lake
- IIT Powai
- Kanjurmarg (West) ↔ Gandhi Nagar (Line 4, under construction)
- Vikhroli EEH
Timeline
- 2028-12-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.