Line 6 · Pink

Line 6 · Pink (Swami Samarth Nagar (Lokhandwala) ↔ Vikhroli EEH): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusUnder construction
OperatorMMRDA / MMMOCL
Corridor being built14.47 km
Stations recorded13 recorded
OpenedNot recorded
Target2028-12-01
Colour#F99FC9
Status as of2026-10-18

Corridor: Swami Samarth Nagar (Lokhandwala) ↔ Vikhroli EEH.

What is being built

14.47 km and 13 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.

Official updates:

Under construction corridor linking Andheri West, Jogeshwari, Powai and Vikhroli; targeted December 2028.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 6

Stations on this line

Under construction — 13 stations

  1. Swami Samarth Nagar (Lokhandwala)
  2. Adarsh Nagar (Mumbai) ↔ Lower Oshiwara (Line 2A)
  3. Jogeshwari (West)
  4. JVLR Junction ↔ Jogeshwari East (Line 7)
  5. Shyam Nagar (Mumbai)
  6. Mahakali Caves
  7. SEEPZ Village ↔ SEEPZ (Line 3)
  8. Saki Vihar Road
  9. Rambaug (Powai)
  10. Powai Lake
  11. IIT Powai
  12. Kanjurmarg (West) ↔ Gandhi Nagar (Line 4, under construction)
  13. Vikhroli EEH

Timeline

  • 2028-12-01 — Target: Full line target

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.