Line facts
| Status | Approved |
|---|---|
| Operator | Not confirmed |
| Planned corridor length | 35 km |
| Stations recorded | 2 recorded of 20 on the full line |
| Opened | Not recorded |
| Target | — |
| Colour | #BF9724 |
| Status as of | 2026-10-18 |
Corridor: CSMIA T2 ↔ NMIA.
Approved — not yet built
Approval is recorded for a 35 km corridor. Not under construction — no section is recorded as under construction. No opening date is recorded.
Approved airport-to-airport corridor linking CSMIA T2 with Navi Mumbai International Airport (about 20 stations planned). It is not under construction and no opening date is announced. Colours and status are recorded from official line maps and the network summary of August 2026.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Approved — 2 stations
- Chhatrapati Shivaji Maharaj International Airport – T2 ↔ Line 3 • Line 7A (under construction)
- NMIA ↔ Navi Mumbai Metro (planned)
2 of 20 stations on this line have individual records so far.