मुंMumbai DarshanMMR Explorer

Mumbai Metro

Line 13 · Purple

Line 13 · Purple (Shivaji Chowk (Mira Road) ↔ Virar): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusPlanned
OperatorNot confirmed
Planned corridor length23 km
Stations recorded2 recorded of 20 on the full line
OpenedNot recorded
Target—
Colour#B896D4
Status as of2026-10-18

Corridor: Shivaji Chowk (Mira Road) ↔ Virar.

Planned corridor

The corridor is recorded as planned. Not under construction — no section is recorded as under construction, and no opening date is recorded.

Proposed 20-station corridor from Mira Road towards Virar; detailed project report in preparation.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 13

Stations on this line

Planned — 2 stations

  1. Shivaji Chowk (Mira Road)
  2. Virar

2 of 20 stations on this line have individual records so far.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.