Mumbai Metro
Line 13 · Purple
Line 13 · Purple (Shivaji Chowk (Mira Road) ↔ Virar): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Planned |
|---|---|
| Operator | Not confirmed |
| Planned corridor length | 23 km |
| Stations recorded | 2 recorded of 20 on the full line |
| Opened | Not recorded |
| Target | — |
| Colour | #B896D4 |
| Status as of | 2026-10-18 |
Corridor: Shivaji Chowk (Mira Road) ↔ Virar.
Planned corridor
The corridor is recorded as planned. Not under construction — no section is recorded as under construction, and no opening date is recorded.
Proposed 20-station corridor from Mira Road towards Virar; detailed project report in preparation.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Planned — 2 stations
- Shivaji Chowk (Mira Road)
- Virar
2 of 20 stations on this line have individual records so far.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.