Mumbai Metro
Line 10 · Green
Line 10 · Green (Gaimukh ↔ Shivaji Chowk (Mira Road)): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Planned |
|---|---|
| Operator | Not confirmed |
| Planned corridor length | 9.2 km |
| Stations recorded | 5 recorded of 8 on the full line |
| Opened | Not recorded |
| Target | — |
| Colour | #00AE5A |
| Status as of | 2026-10-18 |
Corridor: Gaimukh ↔ Shivaji Chowk (Mira Road).
Planned corridor
The corridor is recorded as planned. Not under construction — no section is recorded as under construction, and no opening date is recorded.
Proposed 8-station extension from Gaimukh towards Mira Road, awaiting environment clearance. Five alignment names are published so far; the final station schedule is to be confirmed.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Planned — 5 stations
- Gaimukh
- Gaimukh Reti Bandar
- Varsova Char Phata
- Kashimira
- Shivaji Chowk (Mira Road)
5 of 8 stations on this line have individual records so far.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.