मुंMumbai DarshanMMR Explorer

Mumbai Metro

Line 7 · Red

Line 7 · Red (Dahisar East ↔ Gundavali): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusRunning
OperatorMMMOCL (Maha Mumbai Metro Operation Corporation Ltd)
Corridor length16.5 km
Stations recorded14 recorded
Opened2022-04-02
Target—
Colour#DA291C
Status as of2026-10-18

Corridor: Dahisar East ↔ Gundavali.

Riding this line

This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:

Opened in two stages: Dahisar East–Aarey on 2 April 2022 and Aarey–Gundavali on 19 January 2023. The Gundavali–CSMIA T2 extension is Line 7A.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 7

Opened & targeted sections

  • Dahisar East → Aarey — Running · opened 2022-04-02 · 10.7 km · 10 stations
  • Aarey → Gundavali — Running · opened 2023-01-19 · 5.8 km · 4 stations

Stations on this line

In service — 14 stations

  1. Dahisar East ↔ Line 2A • Line 9
  2. Ovaripada
  3. Rashtriya Udyan
  4. Devipada
  5. Magathane
  6. Poisar
  7. Akurli
  8. Kurar
  9. Dindoshi
  10. Aarey
  11. Goregaon East
  12. Jogeshwari East ↔ JVLR Junction (Line 6, under construction)
  13. Mogra
  14. Gundavali ↔ Western Express Highway (Line 1)

Timeline

  • 2022-04-02 — Opened: Full line opening
  • 2023-01-19 — Opened: Aarey to Gundavali

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.