Mumbai Metro
Line 7 · Red
Line 7 · Red (Dahisar East ↔ Gundavali): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Running |
|---|---|
| Operator | MMMOCL (Maha Mumbai Metro Operation Corporation Ltd) |
| Corridor length | 16.5 km |
| Stations recorded | 14 recorded |
| Opened | 2022-04-02 |
| Target | — |
| Colour | #DA291C |
| Status as of | 2026-10-18 |
Corridor: Dahisar East ↔ Gundavali.
Riding this line
This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Opened in two stages: Dahisar East–Aarey on 2 April 2022 and Aarey–Gundavali on 19 January 2023. The Gundavali–CSMIA T2 extension is Line 7A.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Opened & targeted sections
- Dahisar East → Aarey — Running · opened 2022-04-02 · 10.7 km · 10 stations
- Aarey → Gundavali — Running · opened 2023-01-19 · 5.8 km · 4 stations
Stations on this line
In service — 14 stations
- Dahisar East ↔ Line 2A • Line 9
- Ovaripada
- Rashtriya Udyan
- Devipada
- Magathane
- Poisar
- Akurli
- Kurar
- Dindoshi
- Aarey
- Goregaon East
- Jogeshwari East ↔ JVLR Junction (Line 6, under construction)
- Mogra
- Gundavali ↔ Western Express Highway (Line 1)
Timeline
- 2022-04-02 — Opened: Full line opening
- 2023-01-19 — Opened: Aarey to Gundavali
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.