Mumbai Metro
Line 4A · Green
Line 4A · Green (Kasarvadavali ↔ Gaimukh): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Under construction |
|---|---|
| Operator | MMRDA / MMMOCL |
| Corridor being built | 2.88 km |
| Stations recorded | 2 recorded |
| Opened | Not recorded |
| Target | 2028-12-01 |
| Colour | #00AE5A |
| Status as of | 2026-10-18 |
Corridor: Kasarvadavali ↔ Gaimukh.
What is being built
2.88 km and 2 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Short extension of Line 4 between Kasarvadavali and Gaimukh; targeted December 2028.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 2 stations
- Kasarvadavali
- Gaimukh
Timeline
- 2028-12-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.