Mumbai Metro
Line 5 · Orange
Line facts
| Status | Under construction |
|---|---|
| Operator | MMRDA / MMMOCL |
| Corridor being built | 12.81 km |
| Stations recorded | 17 recorded |
| Opened | Not recorded |
| Target | 2028-12-01 |
| Colour | #FF8200 |
| Status as of | 2026-10-18 |
Corridor: Kapurbawdi ↔ Kalyan APMC.
What is being built
12.81 km and 17 recorded stations are under construction, with a published target of 2028-12-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Kapurbawdi–Bhiwandi section under construction (8 stations, 12.81 km), targeted December 2028. The Bhiwandi–Kalyan APMC extension (9 stations, 10.72 km) is proposed.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 8 stations
- Kapurbawdi ↔ Line 4
- Balkum Naka
- Kasheli
- Kalher
- Purna
- Anjur Phata
- Dhamankar Naka
- Bhiwandi
Planned — 9 stations
- Gopal Nagar
- Temghar
- Rajnouli Village
- Govegaon MIDC
- Kongaon
- Durgadi Fort
- Sahajanand Chowk
- Kalyan Railway Station
- Kalyan APMC
Timeline
- 2028-12-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.