Mumbai Metro

Line 9 · Red

Line 9 · Red (Dahisar East ↔ Subhash Chandra Bose Stadium): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusPartly running
OperatorMMMOCL (Maha Mumbai Metro Operation Corporation Ltd)
Length in service4.7 km
Stations in service4 in service · 8 planned on the full corridor
Opened2026-04-08
Target2026-11-01
Colour#DA291C
Status as of2026-10-18

Corridor: Dahisar East ↔ Subhash Chandra Bose Stadium.

Riding this line

This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:

Partly running: Dahisar East–Kashigaon (4 stations) in service since 8 April 2026; the remaining stretch to Subhash Chandra Bose Stadium (Mira-Bhayandar) is under construction, targeted November 2026. The ixigo route map lists 4.97 km for the opened section.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 9

Opened & targeted sections

  • Kashigaon → Dahisar East — Running · opened 2026-04-08 · 4.7 km · 4 stations
  • Subhash Chandra Bose Stadium → Kashigaon — Under construction · target 2026-11-01 · 4.3 km · 4 stations

Stations on this line

In service — 4 stations

  1. Dahisar East ↔ Line 2A • Line 7
  2. Pandurang Wadi
  3. Miragaon
  4. Kashigaon

Under construction — 4 stations

  1. Sai Baba Nagar
  2. Deepak Hospital (Medtiya Nagar)
  3. Shahid Bhagat Singh Garden
  4. Subhash Chandra Bose Stadium

Timeline

  • 2026-04-08 — Opened: First section opened
  • 2026-11-01 — Target: Full line target

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.