Navi Mumbai Metro

Navi Mumbai Metro Line 1A · Teal

Navi Mumbai Metro Line 1A · Teal (Sagar Sangam ↔ Belapur CBD): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusApproved
OperatorCIDCO / Maha Metro
Planned corridor length3 km
Stations recorded2 recorded
OpenedNot recorded
Target—
Colour#0F766E
Status as of2026-10-18

Corridor: Sagar Sangam ↔ Belapur CBD.

Approved — not yet built

Approval is recorded for a 3 km corridor. Not under construction — no section is recorded as under construction. No opening date is recorded.

Authority channels:

Three-kilometre extension approved by the Maharashtra government in 2026, planned to connect with the proposed Line 8 at Sagar Sangam. No official line colour is published; the site uses its own teal styling.

Recorded source: Wikipedia — Navi Mumbai Metro; CIDCO · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Navi Mumbai Metro Line 1A

Stations on this line

Approved — 2 stations

  1. Sagar Sangam ↔ Line 8 (proposed)
  2. Belapur CBD ↔ Navi Mumbai Metro Line 1

Source

Wikipedia — Navi Mumbai Metro; CIDCO. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.