Navi Mumbai Metro
Navi Mumbai Metro Line 1A · Teal
Navi Mumbai Metro Line 1A · Teal (Sagar Sangam ↔ Belapur CBD): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Approved |
|---|---|
| Operator | CIDCO / Maha Metro |
| Planned corridor length | 3 km |
| Stations recorded | 2 recorded |
| Opened | Not recorded |
| Target | — |
| Colour | #0F766E |
| Status as of | 2026-10-18 |
Corridor: Sagar Sangam ↔ Belapur CBD.
Approved — not yet built
Approval is recorded for a 3 km corridor. Not under construction — no section is recorded as under construction. No opening date is recorded.
Authority channels:
- CIDCO — official site
Three-kilometre extension approved by the Maharashtra government in 2026, planned to connect with the proposed Line 8 at Sagar Sangam. No official line colour is published; the site uses its own teal styling.
Recorded source: Wikipedia — Navi Mumbai Metro; CIDCO · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Approved — 2 stations
- Sagar Sangam ↔ Line 8 (proposed)
- Belapur CBD ↔ Navi Mumbai Metro Line 1
Source
Wikipedia — Navi Mumbai Metro; CIDCO. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.