मुंMumbai DarshanMMR Explorer

Mumbai Metro

Line 2A · Yellow

Line 2A · Yellow (Andheri West ↔ Dahisar East): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusRunning
OperatorMMMOCL (Maha Mumbai Metro Operation Corporation Ltd)
Corridor length18.6 km
Stations recorded17 recorded
Opened2022-04-02
Target—
Colour#FFC600
Status as of2026-10-18

Corridor: Andheri West ↔ Dahisar East.

Riding this line

This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:

Opened in two stages: Dahisar East–Dahanukarwadi on 2 April 2022 and Dahanukarwadi–Andheri West on 19 January 2023.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 2A

Opened & targeted sections

  • Dahisar East → Dahanukarwadi — Running · opened 2022-04-02 · 9.8 km · 9 stations
  • Dahanukarwadi → Andheri West — Running · opened 2023-01-19 · 8.8 km · 8 stations

Stations on this line

In service — 17 stations

  1. Andheri West ↔ D N Nagar (Line 1) — walking interchange
  2. Lower Oshiwara ↔ Adarsh Nagar (Line 6, under construction)
  3. Oshiwara
  4. Goregaon West
  5. Bangur Nagar
  6. Lower Malad
  7. Malad West
  8. Valnai–Meeth Chowky
  9. Dahanukarwadi
  10. Kandivli West
  11. Shimpoli
  12. Borivali West
  13. Eksar
  14. Mandapeshwar
  15. Kandarpada
  16. Anand Nagar
  17. Dahisar East ↔ Line 7 • Line 9

Timeline

  • 2022-04-02 — Opened: Full line opening
  • 2023-01-19 — Opened: Dahanukarwadi to Andheri West

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.