Line facts
| Status | Running |
|---|---|
| Operator | MMMOCL (Maha Mumbai Metro Operation Corporation Ltd) |
| Corridor length | 18.6 km |
| Stations recorded | 17 recorded |
| Opened | 2022-04-02 |
| Target | — |
| Colour | #FFC600 |
| Status as of | 2026-10-18 |
Corridor: Andheri West ↔ Dahisar East.
Riding this line
This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Opened in two stages: Dahisar East–Dahanukarwadi on 2 April 2022 and Dahanukarwadi–Andheri West on 19 January 2023.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Opened & targeted sections
- Dahisar East → Dahanukarwadi — Running · opened 2022-04-02 · 9.8 km · 9 stations
- Dahanukarwadi → Andheri West — Running · opened 2023-01-19 · 8.8 km · 8 stations
Stations on this line
In service — 17 stations
- Andheri West ↔ D N Nagar (Line 1) — walking interchange
- Lower Oshiwara ↔ Adarsh Nagar (Line 6, under construction)
- Oshiwara
- Goregaon West
- Bangur Nagar
- Lower Malad
- Malad West
- Valnai–Meeth Chowky
- Dahanukarwadi
- Kandivli West
- Shimpoli
- Borivali West
- Eksar
- Mandapeshwar
- Kandarpada
- Anand Nagar
- Dahisar East ↔ Line 7 • Line 9
Timeline
- 2022-04-02 — Opened: Full line opening
- 2023-01-19 — Opened: Dahanukarwadi to Andheri West
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.