Mumbai Metro
Line 7A · Red
Line 7A · Red (Gundavali ↔ CSMIA T2): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.
Line facts
| Status | Under construction |
|---|---|
| Operator | MMMOCL (Maha Mumbai Metro Operation Corporation Ltd) |
| Corridor being built | 3.17 km |
| Stations recorded | 2 recorded |
| Opened | Not recorded |
| Target | 2027-01-01 |
| Colour | #DA291C |
| Status as of | 2026-10-18 |
Corridor: Gundavali ↔ CSMIA T2.
What is being built
3.17 km and 2 recorded stations are under construction, with a published target of 2027-01-01. A target is a plan, not a confirmed opening.
Official updates:
- Maha Mumbai Metro Operation Corporation (MMMOCL) — official site
Two-station extension connecting Line 7 at Gundavali to Chhatrapati Shivaji Maharaj International Airport Terminal 2; targeted January 2027.
Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Stations on this line
Under construction — 2 stations
- Airport Colony
- Chhatrapati Shivaji Maharaj International Airport – T2 ↔ Line 3
Timeline
- 2027-01-01 — Target: Full line target
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.