मुंMumbai DarshanMMR Explorer

Mumbai Metro

Line 7A · Red

Line 7A · Red (Gundavali ↔ CSMIA T2): status, stations, interchanges, targets and verified sources, recorded as of 2026-10-18.

Line facts

StatusUnder construction
OperatorMMMOCL (Maha Mumbai Metro Operation Corporation Ltd)
Corridor being built3.17 km
Stations recorded2 recorded
OpenedNot recorded
Target2027-01-01
Colour#DA291C
Status as of2026-10-18

Corridor: Gundavali ↔ CSMIA T2.

What is being built

3.17 km and 2 recorded stations are under construction, with a published target of 2027-01-01. A target is a plan, not a confirmed opening.

Official updates:

Two-station extension connecting Line 7 at Gundavali to Chhatrapati Shivaji Maharaj International Airport Terminal 2; targeted January 2027.

Recorded source: MMMOCL (official) + Wikipedia + ixigo · status as of 2026-10-18.

Corridor sketch

Simplified sketch of this corridor on the network map. See all 20 lines.

Sketch map of Line 7A

Stations on this line

Under construction — 2 stations

  1. Airport Colony
  2. Chhatrapati Shivaji Maharaj International Airport – T2 ↔ Line 3

Timeline

  • 2027-01-01 — Target: Full line target

A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.

Source

MMMOCL (official) + Wikipedia + ixigo. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.