Navi Mumbai Metro
Navi Mumbai Metro Line 1 · Teal
Line facts
| Status | Partly running |
|---|---|
| Operator | Maha Metro (on behalf of CIDCO) |
| Length in service | 11.1 km |
| Stations in service | 11 in service · 20 planned on the full corridor |
| Opened | 2023-11-17 |
| Target | — |
| Colour | #0F766E |
| Status as of | 2026-10-18 |
Corridor: CBD Belapur ↔ Khandeshwar.
Riding this line
This page records facts and sources — it does not publish fares or timetables. For current timings, fares and official apps, use the operator’s own channels:
- CIDCO — official site
Phase 1 (Belapur–Pendhar, 11.1 km, 11 stations) in service since 17 November 2023. Fares ₹10–₹30. Later phases towards Taloja MIDC, Kalamboli, Kamothe and Khandeshwar are planned; a further link to NMIA is proposed. No official line colour is published, so the site uses its own teal styling here.
Recorded source: Wikipedia — Navi Mumbai Metro; CIDCO · status as of 2026-10-18.
Corridor sketch
Simplified sketch of this corridor on the network map. See all 20 lines.
Opened & targeted sections
- CBD Belapur → Pendhar — Running · opened 2023-11-17 · 11.1 km · 11 stations
Stations on this line
In service — 11 stations
- CBD Belapur ↔ Suburban rail (CBD Belapur)
- RBI Colony
- Belpada ↔ Suburban rail (Kharghar)
- Utsav Chowk (Kharghar)
- Kendriya Vihar
- Kharghar Village
- Central Park (Kharghar)
- Pethpada (Kharghar)
- Amandoot ↔ Line 5 (proposed alignment)
- Pethali–Taloja ↔ Suburban rail (Taloje Panchnand)
- Pendhar
Planned — 8 stations
- MIDC Station 2
- MIDC Station 1
- Kasadi
- Sector 7E (Kalamboli)
- Sector 13 (Kalamboli)
- Sector 2E (Kalamboli)
- Sector 10 (Kamothe)
- Khandeshwar ↔ Suburban rail (Khandeshwar)
Timeline
- 2023-11-17 — Opened: First section opened
A target is a published plan, not a confirmed opening; each entry keeps the source recorded on this page.
Source
Wikipedia — Navi Mumbai Metro; CIDCO. Retrieved 2026-10-18; status recorded as of 2026-10-18. Sketch geometry is simplified and not to scale.